      Incentivos y estructura del nuevo cargo por confiabilidad en el sector eléctrico en Colombia Translated title: New reliability charge incentives and structure in the Colombian electrical sector

      research-article

      Read this article at

      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          Asegurar la confiabilidad en el sector eléctrico ha sido siempre una preocupación central de todo diseño de política del sector. No obstante, para sistemas predominantemente hidráulicos como lo es el colombiano, que operan en la zona ecuatorial americana, el reto de garantizar la confiabilidad puede ser incluso mayor toda vez que fenómenos climatológicos como El Niño pueden producir desajustes importantes del lado de la oferta que dificultan el logro del equilibrio real entre demanda y oferta. De este modo, se requiere una estructura regulatoria muy específica para garantizar la existencia de unidades de generación de respaldo que entren a operar en épocas de hidrología crítica. Este artículo estudia el nuevo cargo de confiabilidad propuesto por la CREG, y en particular, sus características así como los incentivos en él establecidos para garantizar la confiabilidad del sistema eléctrico en condiciones de hidrología extrema. El diseño del nuevo sistema promueve la confiabilidad del sector en períodos de escasez e incentiva nuevas instalaciones en generación de respaldo, cumpliendo así con su objetivo central. No obstante, el diseño del instrumento podría mejorarse, incluyendo explícitamente una penalidad por incumplimiento, con el propósito de desestimular la entrada al mercado de energía firme de jugadores con bajos niveles de confiabilidad, o de especuladores.

          Translated abstract

          Ensuring sector reliability has always been an important issue in electrical sector policy. However, the challenge could be even greater for hydrodependent systems (as in the Colombian system) operating in the South-American equatorial zone, since climatic shocks such as the “el niño” phenomenon usually have a very strong impact on supply, thereby leading to market disequilibrium. Such systems thus require a very specific regulatory structure to assure generation units as “backup units” which may generate electrical energy during critical moments. This paper examines the new reliability charge developed by the Colombian Commission for Regulating Energy and Gas (CREG), its characteristics and incentive mechanisms to ensure Colombian electrical system reliability under extreme weather condition. The new system promotes sector reliability during periods of scarcity and provides a clear incentive for new investment in backup generation. However, the instrument’s design could be improved if it included an explicit penalty for those units which do not honor their firm energy commitment. The instrument could thus encourage the nonentry of units which have either low reliability levels or speculative purposes.

          Related collections

          Most cited references21

          • Record: found
          • Abstract: not found
          • Book: not found

          Options, Futures and Other Derivatives

            Bookmark
            • Record: found
            • Abstract: not found
            • Article: not found

            Generation Adequacy via Call Options Obligations: Safe Passage to the Promised Land

              Bookmark
              • Record: found
              • Abstract: not found
              • Article: not found

              Mean reverting processes—Energy price processes used for derivatives pricing and risk management

                Bookmark

                Author and article information

                Contributors
                Role: ND
                Role: ND
                Journal
                iei
                Ingeniería e Investigación
                Ing. Investig.
                Facultad de Ingeniería, Universidad Nacional de Colombia. (Bogotá )
                0120-5609
                December 2008
                : 28
                : 3
                : 105-115
                Affiliations
                [1 ] Universidad de Los Andes Venezuela
                [2 ] Universidad de Los Andes Venezuela
                Article
                S0120-56092008000300015
                d9b9c6e7-357c-4f30-90e5-0a4a8df8c6d3

                http://creativecommons.org/licenses/by/4.0/

                History
                Product

                SciELO Colombia

                Self URI (journal page): http://www.scielo.org.co/scielo.php?script=sci_serial&pid=0120-5609&lng=en
                Categories
                ENGINEERING, MULTIDISCIPLINARY

                General engineering
                reliability charge,generating system reliability,electrical energy,market instruments,firm energy options,cargo por confiabilidad,confiabilidad del sistema de generación,energía eléctrica,instrumentos de mercado,opciones de energía firme

                Comments