      Contractor prequalification for green buildings—evidence from Turkey

      ,
      Engineering, Construction and Architectural Management
      Emerald

      Read this article at

      ScienceOpenPublisher
      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          Purpose

          Competent contractors are one of the critical stakeholders to achieve targeted sustainability objectives in green building (GB) projects. Prior to contractor selection, prequalification is an important step, which requires contractors with certain capabilities in addition to traditional features. This study aims to develop a systematic and practical model for prequalification in GB projects using a multi-criteria decision-making (MCDM) approach by adopting the analytical hierarchy process (AHP).

          Design/methodology/approach

          The AHP model with 8 main criteria groups and 25 sub-criteria is structured based on literature review and professional opinions accompanied by a pilot study. Then, interviews with experts, who are experienced in the development and application phases of GB projects in Turkey, are arranged to collect judgements. The agreement levels between different groups of experts are analysed via Pearson's and Spearman's rank correlation coefficient. Model applicability is tested on six hypothetical contractors for practicality.

          Findings

          The results show that i) financial capabilities, ii) legal status and iii) sustainability groups are the top three main criteria, while i) compliance with schedule requirements of the client, ii) current legal status including suits, iii) negative litigation history records, iv) contractor's compliance capacity to client's sustainability checklist for the proposed project and v) sustainability with lower life cycle cost (durability, maintenance, constructability) are the top five sub-criteria.

          Originality/value

          There is a gap in the literature analysing contractor prequalification phase in GB projects. This study attempts to fill this lack provided with a practical evaluation tool.

          Related collections

          Most cited references75

          • Record: found
          • Abstract: not found
          • Article: not found

          The analytic hierarchy process—what it is and how it is used

          R.W. Saaty (1987)
            Bookmark
            • Record: found
            • Abstract: not found
            • Article: not found

            Green building research–current status and future agenda: A review

              Bookmark
              • Record: found
              • Abstract: not found
              • Article: not found

              An exploration of measures of social sustainability and their application to supply chain decisions

                Bookmark

                Author and article information

                Contributors
                Journal
                Engineering, Construction and Architectural Management
                ECAM
                Emerald
                0969-9988
                January 30 2020
                July 20 2020
                January 30 2020
                July 20 2020
                : 27
                : 6
                : 1377-1400
                Article
                10.1108/ECAM-10-2019-0543
                d0b6f36c-4fa4-4664-82a7-52a5e722acc9
                © 2020

                https://www.emerald.com/insight/site-policies

                History

                Comments

                Comment on this article