Inviting an author to review:
Find an author and click ‘Invite to review selected article’ near their name.
Search for authorsSearch for similar articles
14
views
0
recommends
+1 Recommend
1 collections
    0
    shares
      • Record: found
      • Abstract: found
      • Article: found
      Is Open Access

      Gestión del Riesgo en la Implementación de Sistemas Fotovoltaicos en Proyectos de Extracción de Oro en Colombia a partir del Proceso de Análisis Jerárquico (AHP) Translated title: Risk Management in the Implementation of Photovoltaic Systems in Gold Extraction Projects in Colombia from the Hierarchy Analysis Process (AHP)

      research-article

      Read this article at

      Bookmark
          There is no author summary for this article yet. Authors can add summaries to their articles on ScienceOpen to make them more accessible to a non-specialist audience.

          Abstract

          Resumen: Se identifican los riesgos que afectan la implementación de sistemas fotovoltaicos en proyectos de extracción de oro en Colombia y se prioriza la incidencia de estos riesgos en las fases del proyecto, mediante el método de decisión multicriterio Proceso de Análisis Jerárquico (AHP). Los riesgos identificados a partir de criterios técnicos fueron riesgo diseño, tecnología, y operación, mientras que a partir de criterios económicos fueron riesgo costos, externos y financieros. La fase de construcción es la etapa que probablemente se afecte más, debido a la aparición de estos riesgos, seguida por la fase de planeación y la fase de ejecución. De los criterios técnicos, el que tiene mayor peso es el riesgo diseño, seguido del riesgo operacional y del riesgo técnico. De los criterios económicos, el que tiene mayor peso es el riesgo costos, seguido de los riesgos financieros y de los riesgos externos.

          Translated abstract

          Abstract: The risks that affect the implementation of photovoltaic systems in gold mining projects in Colombia are identified, and the incidence of these risks in the phases of the project is analyzed, using the multicriteria decision method Analysis Hierarchical Process (AHP). The risks identified from technical criteria were design, technology, and operational risk, while based on economic criteria, there were costs, external, and financial risks. The construction phase is the stage that is likely to be most affected, due to the appearance of these risks, followed by the planning phase and the execution phase. Of the technical criteria, the one with greater weight is the design risk, followed by operational risk and technical risk. Of the economic criteria, the one with greater weight is the cost risk, followed by financial risks and external risks.

          Related collections

          Most cited references9

          • Record: found
          • Abstract: not found
          • Article: not found

          Project risk assessment using the analytic hierarchy process

            Bookmark
            • Record: found
            • Abstract: not found
            • Article: not found

            Decision support system for risk management: a case study

              Bookmark
              • Record: found
              • Abstract: not found
              • Article: not found

              A systematic literature review of multicriteria and multi-objective models applied in risk management

                Bookmark

                Author and article information

                Contributors
                Role: ND
                Role: ND
                Role: ND
                Journal
                infotec
                Información tecnológica
                Inf. tecnol.
                Centro de Información Tecnológica (La Serena, , Chile )
                0718-0764
                June 2019
                : 30
                : 3
                : 127-136
                Affiliations
                [2] Manizales Caldas orgnameUniversidad Nacional de Colombia orgdiv1Facultad de Ingeniería y Arquitectura Colombia cdocampog@ 123456unal.edu.co
                [3] orgnameGestión del Conocimiento E-Business orgdiv1Grupo de Investigación Académica Colombia
                [1] Manizales Caldas orgnameUniversidad Nacional de Colombia orgdiv1Facultad de Administración Colombia hmcastanoc@ 123456unal.edu.co
                Article
                S0718-07642019000300127
                20522027-326c-4c0d-b619-4f30fa3a1c02

                This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

                History
                : 24 December 2018
                : 11 October 2018
                Page count
                Figures: 0, Tables: 0, Equations: 0, References: 15, Pages: 10
                Product

                SciELO Chile

                Categories
                Artículos

                gestión de proyectos,análisis jerárquico,risks,AHP,PMI,photovoltaic,project management,hierarchy analysis,riesgos,fotovoltaico

                Comments

                Comment on this article

                Similar content426

                Cited by2

                Most referenced authors49